Construction of weldedsteel pipe line for Southern Natural Gas Corp. on Alto, northern Louisiana to Columbus, Miss., Birmingham, Ala., and Atlanta, Ga.; diameter varies from 12 to 22 in.; line crosses 17 major rivers; approximately 20 railroads had to be tunnelled.
Building a 450-mile pipe line
Contractors Engrs. Monthly
Contractors' and Engineers' Monthly ; 20 , n 3
1930
6 pages
19 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
E. P. and S. W. rebuilds 141-mile wood stave pipe line
Engineering Index Backfile | 1921
|Building Boliden's sixty-mile aerial tramway
Engineering Index Backfile | 1946
11-mile pipe cable completes 132-kv loop
Engineering Index Backfile | 1953
|Plant to serve 546-mile transmission line
Engineering Index Backfile | 1917
Quarter-mile assembly line for truck bodies
Engineering Index Backfile | 1949