Sept 1930 n 9 p 321-328: Railroads participate in $4,600,000 project eliminating busy intersection; grade separation requires mile of double-track viaduct, reconstruction of city viaduct, track changes; difficult design and construction problems solved. Oct 1930 n 10 p 366-371, 28 figs: Structures east of Canal St.; girder spans and steel bents; novel expansion joint; design of pier substructures for unstable ground; river crossings and operating arrangements.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Joint separation of railroad grades at W. 15th Pl. and Stewart Ave., Chicago


    Additional title:

    Eng. Contracting


    Published in:

    Engineering and Contracting ; 69 , n 9-10 ; Various pages


    Publication date :

    1930


    Remarks:

    28 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Interlocking at Stewart Avenue, Chicago

    Engineering Index Backfile | 1892


    Chicago & Western Indiana Railroad

    Ogorek, Cynthia L. / Molony, Bill | SLUB | 2016


    Railroad crossings in Chicago

    Engineering Index Backfile | 1891



    Railroad track elevation in Chicago

    Engineering Index Backfile | 1895