Lack of sufficient rails is causing delays not only in laying of new lines, but also has arrested or delayed renewal of tracks on principal lines; it is calculated that total of 2,475,000 tons of steel will be required in 1931 for needs of railways; this tonnage includes materials needed by locomotive and car works; new iron and steel works are stated to be in course of erection.
Russian railway equipment
Engineer
Engineer ; 150 , n 3909
1930
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1955
Engineering Index Backfile | 1912
Engineering Index Backfile | 1896
IuD Bahn | 2012
|Russian railway construction in Manchuria
Engineering Index Backfile | 1900
|