During past twelve months, Commission, composed of technical, financial, and commercial experts, has been exploring desert, and has covered in aggregate 19,000 mi.; Commission rejects proposed lines from Constantine and Algiers and recommends route from Oran, which appears to remove most of economical objections to Trans-Saharan Railway and to cost much less, both in time and money, than the two other schemes.
The Trans-Saharan railway
Engineer
Engineer ; 148 , n 3859
1929
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Proposed Trans-Saharan railway
Engineering Index Backfile | 1943
Engineering Index Backfile | 1898
The proposed Trans-Saharan railway
Engineering Index Backfile | 1928
Dakar and Trans-Saharan Railway
Engineering Index Backfile | 1941
NTIS | 1952
|