Hundreds of rail ends, pounded down at joints, are rebuilt annually by fleet of electric welding units; average time for complete operation is 25 min. (See also Ry. Eng. and Maintenance vol. 26, no. 7, July 1930 pp. 286-289, 6 figs; Elec. News, vol. 39, no. 23, Dec. 1, 1930, pp. 45-47, 6 figs.)
How the Canadian Pacific arc-welds battered rail ends
Contract Rec
Contract Record ; 44 , n 49
1930
3 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
How the Canadian Pacific arc-welds battered rail ends
Engineering Index Backfile | 1930
How the Canadian Pacific arc-welds battered rail ends
Engineering Index Backfile | 1930
Engineering Index Backfile | 1928
|Welding worn rail ends in track, Canadian Pacific Railway
Engineering Index Backfile | 1929
Lackawanna welds rail ends at night
Engineering Index Backfile | 1943