Track-laying work of Penn-Ohio System carried on while cars move without delay or halt in service; cross-section of track construction employed. (see also Elec. Traction, vol. 26, no. 8, Aug. 1930, p. 435, 2 figs)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Constructing track under traffic


    Additional title:

    Traction Shop Roadway


    Published in:

    Publication date :

    1930


    Size :

    2 pages


    Remarks:

    2 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Constructing track under traffic

    Engineering Index Backfile | 1930



    Replacing a four-track bridge under heavy traffic

    Engineering Index Backfile | 1905


    Track traffic line

    CHEN CHUANSHENG | European Patent Office | 2015

    Free access

    TRACK TRAFFIC SYSTEM AND CONSTRUCTION METHOD FOR TRACK TRAFFIC SYSTEM

    MASUKAWA MASAHISA | European Patent Office | 2021

    Free access