Production methods and equipment, with particular regard to automatic operation, at works of Ruber Owen and Co.; Darlaston, Staffs; passage of work from starting end to finishing end about 2 hr. 45 min.; capacity 22 large-type chassis frames per hour.
Enameling frames
Automobile Engr
Automobile Engineer ; 21 , n 282
1931
2 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1939
Engineering Index Backfile | 1938
Engineering Index Backfile | 1938
Eliminating dust in body enameling
Engineering Index Backfile | 1915
|Porcelain enameling of aircraft exhausts
Engineering Index Backfile | 1943