Production methods and equipment, with particular regard to automatic operation, at works of Ruber Owen and Co.; Darlaston, Staffs; passage of work from starting end to finishing end about 2 hr. 45 min.; capacity 22 large-type chassis frames per hour.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Enameling frames


    Additional title:

    Automobile Engr


    Published in:

    Publication date :

    1931


    Size :

    2 pages


    Remarks:

    3 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Enameling

    Engineering Index Backfile | 1939


    Continuous enameling

    Engineering Index Backfile | 1938


    Continuous enameling

    Engineering Index Backfile | 1938


    Eliminating dust in body enameling

    Spencer, L.V. | Engineering Index Backfile | 1915


    Porcelain enameling of aircraft exhausts

    Engineering Index Backfile | 1943