System policy contributes to operating economy by assuring increased locomotive reliability, longer mileage between heavy repairs and fewer days in shop; heavy maintenance work concentrated; map illustrating major locomotive repair shops on Union Pacific; system shop-production time study produces results; trends in train speed, tractive force, and unit locomotive maintenance cost.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Motive power effectively maintained on the Union Pacific


    Additional title:

    Ry. Age


    Published in:

    Railway Age ; 90 , n 25


    Publication date :

    1931


    Size :

    3 pages


    Remarks:

    5 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English





    Comparisons of railway motive power in Pacific Northwest

    Martin, T.M.C. | Engineering Index Backfile | 1947


    Motive power accounting

    Taylor, W.G. | Engineering Index Backfile | 1897


    Electric motive power

    Weston, W.H. | Engineering Index Backfile | 1896


    Tomorrow's motive power

    Cataldi, Dick / Peter, John | IuD Bahn | 1995