Highway operation enables savings of nearly $10,000 per month in train operating expenses; table of Burlington transportation company motor-coach routes; operating organization and practices.
Burlington substitutes motor coaches for trains
Ry. Age
Railway Age ; 90 , n 9
1931
3 pages
1 Fig.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Substituting motor coaches for trains
Engineering Index Backfile | 1931
Substitute motor coaches for local trains
Engineering Index Backfile | 1929
Engineering Index Backfile | 1930
Coaches watered from overhead on Burlington
Engineering Index Backfile | 1949
Performance of high-speed trains on Burlington
Engineering Index Backfile | 1937
|