Railroad from The Pas to Churchill, 510 mi. long; severe physical and climatic conditions encountered; development of Churchill townsite; sewers and water mains; terminal facilities; water-supply difficulties; frostproof wells; six steel bridges constructed.
Construction of Hudson bay railway
Can. Engr
Canadian Engineer ; 61 , n 8
1931
7 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1932
Engineering Index Backfile | 1932
|Engineering Index Backfile | 1903
Engineering Index Backfile | 1902
North Hudson County electric railway
Engineering Index Backfile | 1895