System extends over 76.7 mi. of line, with 162 track mi, and control of two railroad-crossing layouts; operating problem on Fitchburg division; physical characteristics of line; track and signal plan of centralized control territory. (see also Ry. Signaling, vol. 24, no. 11, Nov. 1931, pp. 371-380 and 384, 19 figs)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Centralized traffic control on Boston and Maine


    Additional title:

    Ry. Age


    Contributors:
    Bacon, A.R. (author)

    Published in:

    Railway Age ; 91 , n 23


    Publication date :

    1931


    Size :

    5 pages


    Remarks:

    3 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Centralized traffic control on Boston and Maine

    Bacon, A.R. | Engineering Index Backfile | 1931


    Centralized traffic control on Boston and Maine

    Engineering Index Backfile | 1932


    Centralized traffic control on Boston and Maine

    Engineering Index Backfile | 1932