System extends over 76.7 mi. of line, with 162 track mi, and control of two railroad-crossing layouts; operating problem on Fitchburg division; physical characteristics of line; track and signal plan of centralized control territory. (see also Ry. Signaling, vol. 24, no. 11, Nov. 1931, pp. 371-380 and 384, 19 figs)
Centralized traffic control on Boston and Maine
Ry. Age
Railway Age ; 91 , n 23
1931
5 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Centralized traffic control on Boston and Maine
Engineering Index Backfile | 1931
|Centralized traffic control on Boston and Maine
Engineering Index Backfile | 1932
Centralized traffic control on Boston and Maine
Engineering Index Backfile | 1932
The Boston and Maine installs centralized control to increase track capacity
Engineering Index Backfile | 1929
|The Boston and Maine installs centralized control to increase track capacity
Engineering Index Backfile | 1929
|