Reconstruction program involves installation of two electropneumatic plants on Norfolk and Western at Portsmouth, Ohio; track layout; a.c. operation and control in both plants.
Power interlocking eliminates delays
Ry. Signaling
Railway Signaling ; 24 , n 10
1931
3 pages
7 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Automatic interlocking eliminates train stops
Engineering Index Backfile | 1933
Simple interlocking eliminates train stops in city streets
Engineering Index Backfile | 1927
|Spring switch on Union Pacific eliminates delays
Engineering Index Backfile | 1935
New electric interlocking on the Burlington eliminates 160 train stops per day
Engineering Index Backfile | 1930
|New freight-handling system at gotham dock eliminates motor truck delays
Engineering Index Backfile | 1917