Necessity for using methods of primary accuracy in city triangulation is shown and also necessity of designing traverse net at same time as triangulation net is designed and stations located. (see also Roads and Streets, vol. 71, no. 10, Oct. 1931, pp. 424-427, 14 figs)
City triangulation
Engineering
Engineering ; 131 , n 3405
1931
4 pages
14 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1931
|British Library Online Contents | 1997
|Delaunay Triangulation in d-Dimensional Space: A Triangulation-Growth Algorithm
British Library Conference Proceedings | 1995
|Global Lightning Triangulation
British Library Conference Proceedings | 1999
|