New freeway from La Canada to Pasadena, complete with four divided lanes and center esplanade, will promote crooked highway to full freeway status; six bridges called for, largest will be 418 ft across Arroyo Seco; types of earth moving equipment used, fill compaction; crane equipment on concrete; typical work stages illustrated.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Foothill freeway: headache road


    Additional title:

    Excavating Engr


    Contributors:
    Day, R. (author)

    Published in:

    Publication date :

    1954


    Size :

    2 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Electrophotooptical technician training at Foothill College.

    Lewis, R. E. / Ponseggi, B. G. / Shaw, C. C. | NTRS | 1966


    Road test of a freeway model

    Hurdle, V.F. | Online Contents | 2000


    Freeway design principles applied on rural road

    Draper, E.S. | Engineering Index Backfile | 1936



    Evaluation of typical road telematics scenarios on a freeway

    Jaap,S. / Bechler,M. / Kleinschmidt,A. et al. | Automotive engineering | 2004