Oceanside-Carlsbad project; features involved were widening and remodeling of 950-ft steel truss structure across San Luis Rey River and crossing of six major water courses, construction of railroad separations, and pedestrian undercrossing.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    New freeway


    Additional title:

    Calif Highways Pub Works


    Contributors:

    Published in:

    Publication date :

    1953


    Size :

    6 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Freeway spacing in urban freeway system

    Peterson, J.M. | Engineering Index Backfile | 1960



    Comparing the Operations of the Freeway-to-Freeway W-Interchange Designs to Other Freeway-to-Freeway Conventional Designs

    Rodevick, N. M. / Institute of Transportation Engineers | British Library Conference Proceedings | 2006


    Urban Freeway Signing and the Freeway Signing Handbook

    H. G. Hawkins / G. L. Ford / S. T. Chrysler | NTIS | 2004


    Freeway Control

    NTIS | 1969