Earth glacier was forcing tracks of Northwestern Pacific railroad sideways 4 ft every 24 hr; 1 3/4-yd shovel, crane, bulldozers were rushed in to pull back and reballast track, keeping railroad open with minimum delay to train; when slide is dry enough for machines to move over it, system of surface ditches will be constructed.
Heavy equipment versus "moving mountain"