Earth glacier was forcing tracks of Northwestern Pacific railroad sideways 4 ft every 24 hr; 1 3/4-yd shovel, crane, bulldozers were rushed in to pull back and reballast track, keeping railroad open with minimum delay to train; when slide is dry enough for machines to move over it, system of surface ditches will be constructed.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Heavy equipment versus "moving mountain"


    Additional title:

    Western Construction


    Published in:

    Publication date :

    1954


    Size :

    2 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Moving mountain

    Barrow, Keith | IuD Bahn | 2011


    Mountain emergency moving lamp

    LI GUIBAO | European Patent Office | 2020

    Free access

    Moving mountain to mill

    Cleary, W.H. | Engineering Index Backfile | 1942


    Heavy equipment in-cabin moving apparatus

    YANG HANBO / CHEN YIN / YANG ZHANGMING et al. | European Patent Office | 2020

    Free access

    Hoisting equipment for heavy hoisting and moving

    YANG QIANGNAN / LU XIAOLONG / LI SHILIN et al. | European Patent Office | 2025

    Free access