Subway line is 4 1/2 mi long with 12 passenger stations; d-c power is supplied at 550 v and distributed by means of positive contact rail; negative return circuit is provided by one of running rails; each car is equipped with four 68-hp, 300-v motors; control and signal system; terminals and yards. (See also Mun Utilities Mag v 92 n 3 Mar 1954 p 39-40, 42, 44, 46, 48, 51-6)
Equipment operation and control in Toronto's rapid-transit subway
Ry Gaz
Railway Gazette ; 100 , n 15
1954
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Equipment operation and control in Toronto's rapid-transit subway
Engineering Index Backfile | 1954
Computer applications in Toronto's rapid transit expansion program
British Library Conference Proceedings | 1994
|Systems Design Integration for Toronto's Rapid Transit Expansion Program
British Library Conference Proceedings | 1994
|Safety Certification of Toronto's New Sheppard Subway Line
British Library Conference Proceedings | 2006
|Bold plans for Toronto's transit network
Online Contents | 2008