Illustrated description of an interesting piece of reconstruction work on the Southeastern and Chatham Railway. A bascule bridge span was replaced by a Scherzer rolling-lift type. (500 w.)
The swale bridge
Engng
1904
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Medway & Swale shipping through time
SLUB | 2012
|BRIDGE MONITORING SYSTEM, BRIDGE MONITORING DEVICE, BRIDGE MONITORING METHOD, AND BRIDGE
European Patent Office | 2019
|