Layout, construction and operating characteristics of plant equipped with two Kaplan turbines driving two generators of 16,000 kva each; pf 0.75; primary voltage 6300 to 6600 v; testing from 9 to 12 m. Construction Operations, by K. TAWAST. (See also - n 3 Mar 1932 p 67-79, n 4 Apr p 107-12)
Abborrforsverket-kraftverkets planering och utformning, etc
Abborrforsverket-kraftverkets planering och utformning, etc
1932
11 pages
Article (Journal)
Finnish
© Metadata Copyright Elsevier B. V. All rights reserved.
Utformning Av Beslutsunderlag Vid Transport-Planering: Etik Eller Mekanik?
British Library Conference Proceedings | 1985
|Utformning Av Cykeltrafikanlaeggningar
British Library Conference Proceedings | 1985
|Skoglig planering : nuläge och tendenser
TIBKAT | 1981
|Höskördesystem med vallfodermattor : utformning och kostnader
TIBKAT | 1994
|