Formal opening by Duke of York; origin of bridge; new bridge has span of 375 ft., and two main arch members are three-pinned type; width of bridge 80 ft., roadway 58 ft. and foot paths 15 ft. 9 in., clear height for shipping has been increased to 85 ft. 6 in. above high water; constructional methods; road and foot path.
Completion of Wearmouth Bridge
Modern Transport
Modern Transport ; 22 , n 555
1929
2 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Completion of Victoria falls bridge
Engineering Index Backfile | 1905
Great bridge at New Orleans nearing completion
Engineering Index Backfile | 1935
Amodal volume completion: 3D visual completion
British Library Online Contents | 2005
|