Over 60 per cent of ship canal used by vessels this fall; description of construction of Port Weller Harbor, locks, flight locks, guard gate, safety weir, etc.; breakwater extension; beautification of canal; notable features.
Welland ship canal nearly completed
Can. Engr
Canadian Engineer ; 57 , n 25
1929
5 pages
8 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1931
Engineering Index Backfile | 1931
Engineering Index Backfile | 1918
|Engineering Index Backfile | 1932
|Engineering Index Backfile | 1931