Scheme provided for independent line starting from Garmisch-Partenkirchen station; "Zugspitz" railway, 3.2-ft.-gage adhesion railway, starts from Garmisch and directly follows existing State Railways line to Griesen, Ehrwald, and Reutte; rack section of line begins at Untergrainau and proceeds first with maximum gradient of 11.85 per cent alongside mountain pass to lake Eib.; tunnel has length of 4810 yards. (English Edition.)
Construction of Bavarian "Zugspitz" railway
Bohrhammer
Bohrhammer -- English Edition ; 9 , n 91
1929
7 pages
15 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1927
Tt. Bavarian zugspitze mountain railway
Engineering Index Backfile | 1929
|Zugspitze rack and funicular railway in Bavarian Alps
Engineering Index Backfile | 1931
|British Library Online Contents | 2003
The 1 C.II.T.Γ. G locomotives of the Bavarian state railway
Engineering Index Backfile | 1920