Observations on settlement and lateral flow, during and after construction, of hydraulic fill of Mount Vernon Memorial Highway, 2 3/4 mi long and 3,500,000 cu yd in volume.
Study of hydraulic fill settlement
Pub Roads
Public Roads ; 15 , n 1
1934
9 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Further study of fill settlement in peat marshes
Engineering Index Backfile | 1929
|Fill settlement despite vertical sand drains
Engineering Index Backfile | 1964
|Wetting-Induced Settlement of Compacted-Fill Embankments
Transportation Research Record | 2001
|