Works equipment; importance of providing for rapid identification of jig, ready availability for use, widest possible use of each jig, and regular inspection and maintenance; stamping system used by works to assist in rendering identification readily possible.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Jig, fixture, and gauge organisation at Eastleigh works, southern railway


    Additional title:

    Ry Engr


    Published in:

    Railway Engineer ; 54 , n 646


    Publication date :

    1933


    Size :

    2 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Eastleigh Works Part 2

    Minnis, J. | British Library Online Contents | 1995



    Engineering works on the southern railway

    Engineering Index Backfile | 1929


    Engineering works on the Southern railway

    Engineering Index Backfile | 1929