First installation in Europe brought into use between Paris and Acheres, by addition of two lines; equipped with track-circuit-controlled apparatus, automatic signals and c.t.c. apparatus to be worked by despatcher at St. Lazare station, Paris, about 16 km distant; plans showing section of line before and after installation.
Centralised traffic control in France
Ry Engr
Railway Engineer ; 55 , n 1
1934
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1936
|Centralised traffic control centres
British Library Conference Proceedings | 1998
|Centralised Traffic Control Centres (CTC)
Tema Archive | 1998
|Siemens centralised traffic control centres
IET Digital Library Archive | 2000
|Centralised traffic control on Netherlands railways
Engineering Index Backfile | 1966