Methods and results of 1932 and 1933 traffic surveys; relation between trip time, volume of traffic and bridge openings; traffic counts; construction of viaduct advantageous to traffic on other routes.
Time study of traffic flow on New Jersey high-level viaduct
Pub Roads
Public Roads ; 14 , n 12
1934
10 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The Penhorn Creek viaduct, Jersey City
Engineering Index Backfile | 1911
Tunnel and viaduct to ease Seattle's traffic troubles
Engineering Index Backfile | 1952
|Viaduct entrance ramp traffic congestion grade estimation method
European Patent Office | 2015
|Tunnel and viaduct to ease Seattle's traffic troubles
Engineering Index Backfile | 1953
|Engineering Index Backfile | 1890