Line extends from Lucerne to Chiasso on Italian border, distance of 180 miles. There is average grade of 2.5 per cent for 30 miles. Current at 15,000 volts is supplied to locomotives.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Electrification of St. Gotthard Line, Switzerland


    Additional title:

    Ry. Age


    Contributors:

    Published in:

    Railway Age ; 70 , n 19


    Publication date :

    1921


    Size :

    6 pages


    Remarks:

    13 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Electrification of the Swiss railway's Gotthard line

    Dassenbach, F. | Engineering Index Backfile | 1922


    The electrification of the Gotthard railway

    Brecht, G. | Engineering Index Backfile | 1914


    Electrification of the Saint Gotthard railway

    Kerbaker, Ettore | Engineering Index Backfile | 1922


    The electrification of the st. Gotthard railway

    Engineering Index Backfile | 1922


    Electrification in Switzerland

    Engineering Index Backfile | 1944