With improvements being terminated station will have 21 platform tracks for daily traffic of about 1200 main line and suburban trains. Electric operation by third-rail system is used for suburban service.
Enlarged Waterloo station, London and Southwestern Ry
Eng. News-Rec
Engineering News-Record ; 86 , n 10
1921
5 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1918
The new Waterloo Station, London and South Western Railway
Engineering Index Backfile | 1922
Royal opening of Waterloo station, London and south-western railway
Engineering Index Backfile | 1922
Waterloo Station : through time
SLUB | 2013
|Improving approach to Waterloo station
Engineering Index Backfile | 1936