Work on Leguia Terminal, at Callao, to be completed within four years at cost of more than 1,500.000 pounds Peruvian; will give port for ships of deep draft; Callao the oldest Pacific seaport of South America and regarded as best port; general plan of project; cross-sections of breakwater and dock construction; brief description of project.
The new Port of Callao, Peru
El puerto nuevo de Callao, Peru
Ingenieria Internacional ; 16 , n 7
1928
4 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1956
Engineering Index Backfile | 1934
Engineering Index Backfile | 1928
|Terminal developments at Callao, Peru
Engineering Index Backfile | 1931
|Engineering Index Backfile | 1908