Work done over following lines: Williston to Waterbury, 18 mi.; Waterbury to Montpelier Jet, 18 mi.; Montpelier Jet to Randolph, 30 mi.; Randolph to White River Jet, 32 mi.
Repairing flood damages on Central Vermont railway
Can. Ry. Mar. World
1928
2 pages
1 Fig.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Central Vermont acclaims its first through service since November flood
Engineering Index Backfile | 1928
Engineering Index Backfile | 1937
|Electric railway power at Rutland, Vermont
Engineering Index Backfile | 1906
Central Vermont compound consolidation
Engineering Index Backfile | 1905
Central Vermont features modern transportation
Engineering Index Backfile | 1937