Midi railway of France; general scheme; current supplied to traction substations at 60,000 volts is transformed into direct current at 1,500 volts; hydroelectric power stations; plant in Hautes-Pyrenees; Basses-Pyrenees equipment; transformer plant; 150,000 volt-transmission lines. (See also - vol. 19, nos. 487, 488, 489, July 14, 21 and 288, 1928, pp. 3-5, 3-5, 5-7; and vol. 20, no. 495, Sept. 7, 1928, pp. 7-8, 5 figs.)
Railway electrification in Europe
Modern Transport
Modern Transport ; 19 , n 494
1928
2 pages
18 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Railway electrification in Europe
Engineering Index Backfile | 1928
Railway electrification in Europe
Engineering Index Backfile | 1928
Railway electrification in Europe
Engineering Index Backfile | 1928
Railway electrification in Europe
Engineering Index Backfile | 1928
Railway electrification in Europe
Engineering Index Backfile | 1928