Completion of Nice-Coni line; route of French portion; constructional difficulties; 45 tunnels aggregating about 14 3/4 mi.; geological problems; difficulties connected with nature of soil; equipment of line.
A new Franco-Italian railway link
Modern Transport
Modern Transport ; 20 , n 502
1928
1 Fig.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The international Franco-Spanish Noguera-Pallaresa railway
Engineering Index Backfile | 1911
Preview - Geneva show, a Franco-Italian fashion parade
Online Contents | 2001
Electric bus development through a Franco Italian partnership
British Library Conference Proceedings | 2001
|Franco-Italian tieup reshapes European electronic warfare sector
Online Contents | 1996
Italian railway electrification
Engineering Index Backfile | 1934