After three years of preliminary work, agreement turning all port rail trackage over to harbor belt-line railway to be operated as separate corporation signed by Los Angeles Board of Harbor Commissioners and by four railroads that reach harbor; track mileage 122.7, valuation $57,927,732; after five years any party to agreement may withdraw upon two years' written notice.
Belt-line railroad agreement for Los Angeles harbor
Eng. News-Rec
Engineering News Record ; 101 , n 8
1928
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Los Angeles harbor improvements
Engineering Index Backfile | 1914
|Los Angeles harbor -- World port
Engineering Index Backfile | 1941
Los Angeles Harbor Numerical Analysis of Harbor Oscillations
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1977
|Ship Navigation Simulation Study, Los Angeles Harbor, Los Angeles, California
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1994
|