Automatic signals completed on 5127 miles of road, 142 interlocking plants built and 2074 automatic highway crossing signals installed; interesting features of interlocking construction in 1927; highway-crossing protection increased; work under construction; train control in 1927. (see also Ry. Signaling, vol. 21, no. 1, Jan. 1928, pp. 11-24, 4 figs)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Signaling construction continues in large volume


    Additional title:

    Ry. Age


    Contributors:
    Dunn, J.H. (author)

    Published in:

    Railway Age ; 84 , n 1


    Publication date :

    1928


    Size :

    7 pages


    Remarks:

    2 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Signaling construction continues in large volume

    Dunn, J.H. | Engineering Index Backfile | 1928


    Signaling construction continues in average volume during 1928

    Dunn, J.H. | Engineering Index Backfile | 1929




    Traffic volume continues heavy

    Layng, C. | Engineering Index Backfile | 1945