Description of 152-lever electric interlocking (130 working levers, 22 spare spaces) installed at crossing of Eastern subdivision with Toledo Terminal railway at Stanley, O.; plant spread over extensive area; derails, parkway cable, and telephone system are features of installation; method of operation.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Electric plant on N.Y.C. replaces two mechanical plants


    Additional title:

    Ry. Signaling


    Contributors:

    Published in:

    Publication date :

    1928


    Size :

    5 pages


    Remarks:

    10 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    N.Y.C. trains its supervisors

    Engineering Index Backfile | 1952


    N.Y.C. installs big NX plant at Fostoria, Ohio

    Engineering Index Backfile | 1950


    Electric plant replaces three mechanical interlockings

    Phinney, R.M. | Engineering Index Backfile | 1926


    N.Y.C. gets new fire fighter

    Engineering Index Backfile | 1954


    N.Y.C. gets new fire fighter

    Engineering Index Backfile | 1954