Personal observations of control works by spur dikes and training walls at different times during 47 years together with conclusions on efficiencies; location of revetment mattresses and groins with date of laying.
Mississippi. Stabilizing the plum point reach of the Mississippi river
Eng. News-Rec
Engineering News Record ; 101 , n 22
1928
4 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Buck Island Reach, Mississippi River: Hydraulic Model Investigation
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1985
|Loosahatchie-Memphis Reach, Lower Mississippi River: Hydraulic Model Investigation
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1996
|Redeye Crossing Reach, Lower Mississippi River. Report 1: Sediment Investigation
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1995
|Redeye Crossing Reach, Lower Mississippi River. Report 2: Navigation Conditions
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1996
|