Completion of Fairview grade separation marks another step in Milwaukee Electric Railway and Light Co.'s plan for high-speed service to heart of Milwaukee; construction methods in cut; methods employed in fill construction; track and overhead construction.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Grade separation speeds service


    Additional title:

    Elec. Traction


    Published in:

    Publication date :

    1928


    Size :

    3 pages


    Remarks:

    5 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Speed up service with grade separation

    Baker, S.C. | Engineering Index Backfile | 1930


    Grade separation for high speed service

    Engineering Index Backfile | 1928


    Rerouting speeds service

    Kennedy, W.W. | Engineering Index Backfile | 1928



    Maximum safe vehicle speeds at railroad grade crossings

    Johnson, A.A. | Engineering Index Backfile | 1958