Fast-moving track relaying group developed by Plasser and Theurer in conjunction with German Federal Railway is made up of group of machines, designated SUZ 2000, and comprises 12 vehicles and off-track grader; train of equipment completely replaces 2000-m length of track in 9-hr shift and does not require preparatory laying-out of materials on site or picking up of rails and ties on completion. (29671)
Continuous track laying equipment
Ry Gaz
Railway Gazette ; 125 , n 8
1969
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Continuous laying networking radar target track fusion method
European Patent Office | 2023
|Engineering Index Backfile | 1951