Comprises central station of 15,000 kw. and 60 miles of high-tension transmission lines, 5 sub-stations and electric equipment for 100 miles of single track. A. c. generated at 20,000 volts and converted to d. c. at 800 volts for traction purposes.
Electrification of Central argentine railway
La traction electrique sur le chemin de fer central argentin
Revue Generale de l'Electricite ; 6 , n 3
1919
7 pages
3 Figs.
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Central Argentine railway electrification
Engineering Index Backfile | 1935
Central argentine railway workshops electrification
Engineering Index Backfile | 1910
Electrification of the Central Argentine railway
Engineering Index Backfile | 1918
Central argentine electrification
Engineering Index Backfile | 1916
Operating results of the Buenos Aires suburban electrification of the Central argentine railway
Engineering Index Backfile | 1929
|