New technique developed for welded tanker construction intended to make projecting edge of sheerstrake free from stress concentrations by bending it in three places so that it turns through approximately 90° and can be connected by automatic welding to deck stringer plate; first ship so welded is motor tanker "Brita Onstad".
New technique in gotaverken-built tankers
Mar Engr Naval Architect
Marine Engineer and Naval Architect ; 75 , n 908
1952
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Distinctive ships - Two tankers built by Gotaverken for Malmos
Tema Archive | 1976
Pneumatic engine control by Gotaverken
Engineering Index Backfile | 1964
Pneumatic engine control by Gotaverken
Engineering Index Backfile | 1964
The Götaverken ships diesel now supercharged
IOS Press | 1955
Pneumatic engine control by Gotaverken
Engineering Index Backfile | 1964