In bridge renewal project involving single track span across Sheboygan River, Sheboygan, Wis, Chicago and North Western erected shop riveted deck plate girder span, 162 ft long, continuous over three supports; it was installed to replace pin-connected deck truss drawspan, erected in 1893; description of project.
Ships and erects 162-ft span as unit
Ry Age
Railway Age ; 124 , n 26
1948
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
F.E.C. erects first all-welded bascule span
Engineering Index Backfile | 1936
|Century erects hangar-terminal
Engineering Index Backfile | 1932
Michigan Erects First SPUI Bridge
British Library Online Contents | 2007
Canadian national erects new catenary
Engineering Index Backfile | 1925
|Launcher erects post-tensioned girders
Engineering Index Backfile | 1967
|