New pavement consists of 8-in. concrete base with 3-in. asphalt surface; curbs were set back 5 ft on either side, thus furnishing 60-ft roadway; pedestrian safety islands 5 ft wide by 30 ft long were provided; 57 ft 6 in. wide base was concreted in three 19 ft 2 in. lanes; method of casting traffic strips on top of green concrete base is described.
Face-lifting Milwaukee's Wisconsin ave
Roads Streets
Roads and Streets ; 91 , n 5
1948
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1955
|"Deluge" Milwaukee's new fire boat
Engineering Index Backfile | 1949
|Milwaukee's 31 new passenger cars
Engineering Index Backfile | 1943
Milwaukee's college of driving knowledge
Engineering Index Backfile | 1941
|"Deluge" Milwaukee's new fire boat
Engineering Index Backfile | 1949