New pavement consists of 8-in. concrete base with 3-in. asphalt surface; curbs were set back 5 ft on either side, thus furnishing 60-ft roadway; pedestrian safety islands 5 ft wide by 30 ft long were provided; 57 ft 6 in. wide base was concreted in three 19 ft 2 in. lanes; method of casting traffic strips on top of green concrete base is described.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Face-lifting Milwaukee's Wisconsin ave


    Additional title:

    Roads Streets


    Published in:

    Publication date :

    1948


    Size :

    2 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Milwaukee's parking problem

    Zeidler, F.P. | Engineering Index Backfile | 1955


    "Deluge" Milwaukee's new fire boat

    Robinson, D. | Engineering Index Backfile | 1949


    Milwaukee's 31 new passenger cars

    Engineering Index Backfile | 1943


    Milwaukee's college of driving knowledge

    Dickinson, J.G. / Hackbarth, W. / Stark, P. | Engineering Index Backfile | 1941


    "Deluge" Milwaukee's new fire boat

    Engineering Index Backfile | 1949