About 1000 mi are plowed; in addition, snow is loaded and hauled away from about 100 mi of streets; plowing operations after 5 in. and 9 in. snow fall is completed in 12 and 18 hr, respectively; typical machinery is illustrated; notes on parking problem during snow plowing and loading operations.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    How Minneapolis does its snow plowing


    Additional title:

    Roads Streets


    Contributors:

    Published in:

    Publication date :

    1948


    Size :

    3 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Trend in snow-plowing

    Johnston, T. | Engineering Index Backfile | 1939


    Runway snow plowing plan

    Engineering Index Backfile | 1948


    Modeling forces on trucks plowing snow

    Olson,W.W. / Kempainen,A. / Milacic,D. et al. | Automotive engineering | 1998


    Modeling forces on tracks plowing snow

    British Library Online Contents | 1998


    Vehicle Routing for Urban Snow Plowing Operations

    Perrier, Nathalie | Online Contents | 2008