520-ft tanker had 200 ft of forward bottom plating and internal structure torn off by running ashore on Island of Skye; repairs carried out at Palmer's Drydock, Swansea, by Prince of Wales Drydock Co; diagrams showing extent of damages and various phases of repair. Before Instn Naval Architects. (See also Shipbldg and Shipg Rec v 71 n 13 Mar 25 1948 p 378-83, n 14 Apr 1 p 407-9)
Temporary Hull repairs to tanker "Markay,"
Shipbldr Mar Engine-Bldr
Shipbuilder and Marine Engine-Builder ; 55 , n 478
1948
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Temporary Hull repairs to tanker "Markay,"
Engineering Index Backfile | 1948
|Engineering Index Backfile | 1926
|Repairs to motor tanker Australia
Engineering Index Backfile | 1935
|Major bottom repairs on tanker
Engineering Index Backfile | 1944
Double Hull Tanker Design Issues
British Library Conference Proceedings | 1992
|