Equipment of San Diego naval operating base plant to supply power services, water, steam, compressed air, etc, for ships and buildings; steam is raised in battery of three 40,000-lb per hr 3-drum bent tube oil fired steam generators delivering at 150 psi; list of equipment.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Power services meet fleet halfway


    Additional title:

    Power


    Contributors:
    Nishkian, M.A. (author) / Lewis, G. (author)

    Published in:

    Power ; 92 , n 8


    Publication date :

    1948


    Size :

    3 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    DEFENCE - Halfway to PAK FA

    Butowski, Piotr | Online Contents | 2004




    The EC DRIVE programme-halfway through

    Bell, M. / Catling, I. | Tema Archive | 1990