In selection of equipment there is possibility of using monorail type with switches serving spurs branching out to specific areas, or tramrail type where traveling beam or bridge rides on two or more suspended rails running length of area serviced; suggestions as to planning, installation, first costs, operating and maintenance costs.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Plant engineering department considers case for overhead handling


    Additional title:

    Plant Eng


    Contributors:

    Published in:

    Publication date :

    1949


    Size :

    3 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English





    Certain overhead department economies

    Harte, Charles R. | Engineering Index Backfile | 1918


    Overhead-handling, universal-positioning device

    Johnson, M. / Mann, R. | NTRS | 1977


    Track and overhead department economics

    Greer, J.W. | Engineering Index Backfile | 1895


    Cargo handling with overhead crane gear

    Rohn, A.C. / Smith, I.W. / Hanes, G.B. | Engineering Index Backfile | 1948