On Nov 21 1948 three new sections of line were brought into public use for Central Line tube train operation, adding 10 mi to length of Central Line of London Transport; sections are from Greenford to West Ruislip, in west, which has involved new construction; and Woodford to Loughton, and Woodford via Grange Hill loop to Hainault, in east, both newly electrified sections of existing Eastern Region lines; layout diagrams presented. (See also - illus p 609-12)
Further central line extensions
Ry Gaz
Railway Gazette ; 89 , n 22
1948
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Central line extensions into Essex
Engineering Index Backfile | 1947
Central line extensions into essex
Engineering Index Backfile | 1947
Central line extensions into Essex
Engineering Index Backfile | 1948
Further Extensions of the Tanker Scheduling Problem
NTIS | 1969
|FHTS Active Thermal Control Analyser - Further Improvements and Extensions
SAE Technical Papers | 1993
|