2 1/8 mi expressway passes under 5 streets, 2 railroads and 2 pedestrian crossings; two 24 ft pavements are separated by 15 ft sodded median or by raised concrete median 6 ft wide; three colors of concrete are used for safety; data on lighting and drainage; general description of concrete bridges; total cost $8,045, 000.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Speeding up San Antonio traffic


    Additional title:

    Eng News-Rec


    Published in:

    Publication date :

    1949


    Size :

    3 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Speeding traffic with light signals

    Egeler, C.E. | Engineering Index Backfile | 1926



    Speeding up traffic at street intersections

    Swan, Herbert S. | Engineering Index Backfile | 1923