First floor of East New York Bus Garage in Brooklyn has storage capacity of 280 buses and servicing facilities; second floor reached by short ramps from street, devoted to repair and overhaul shops; garage is trapezoid of 196,000 sq ft with outer walls of brick, partitions of brick or gypsum block; 4000 sprinklers and cinder block fire wall minimize fire risk; floor has 7-in. thick reinforced concrete pavement.
Bus garage for high-speed servicing
Eng News-Rec
Engineering News-Record ; 142 , n 3
1949
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Servicing trucks safely in modern garage
Engineering Index Backfile | 1936
|STATIONARY MULTI-FUNCTIONAL COMPLEX FOR SERVICING HIGH-SPEED RAIL VEHICLES
European Patent Office | 2019
|