How two fast scraper fleets moved 600,000 cu yd per mo to complete protective earth dike system along Coachella Canal in Southern California; canal will supply water to over 100 sq mi of valley land; final bid price about $916,000.
Dike in the desert
Roads Streets
Roads and Streets ; 91 , n 11
1948
4 pages
Illustrations and Maps
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1928
|Scour Experiments on Dike Angle, Porosity, and Hook for a Thin Dike
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 2002
|For dike improvement plan it is necessary to examine dike embankment and foundation
Engineering Index Backfile | 1930
|Erosion stability of dike foreshores
Online Contents | 1997
|Gautrelle Dike analysis at Oleron island
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 2019
|